Bundoora lift upgrades

Starting 21 November 2023, three lifts will be upgraded across the Melbourne (Bundoora) campus as they’ve reached end of life.

While works are underway, lifts will be out of operation in the George Singer, Education 1 and Social Sciences buildings and you may experience some intermittent noise.

See below for project dates in each building and alternative access routes during the works:

BuildingProject datesAlternative access routes
George Singer21 November 2023 to 18 February 2024The stairwells at the east and west ends of the building
The external walkways (for level 2 only)
Education 121 November 2023 to 18 February 2024The stairwell at the west end of the building, adjacent to the lift The lift in HU2 (for levels 1-3 only)
The external link bridge from DME (for levels 1-3 only)
Social Sciences6 February 2024 to 30 April 2024The stairwells at the east and west ends of the building
The external walkways (for level 2 only)
The lift in DW