Photographs of the construction phase in Melbourne
and of the first installation test run on the TGM4 beamline at BESSY
in March 2003.
During
Construction: |
|
|
|
|
Table
assembly (step 1). |
|
Table
assembly (step 2). |
|
|
Table
assembly (step 3). |
|
Mounting
bottom part of analyzer chamber. |
|
|
Inner
toroid rough casting |
|
Output
lens casting. |
|
|
Output
lens system after assembly. |
|
Inner
toroid mounted on output lens system. |
|
|
Outer
toroid. |
|
Mounting
outer toroid over inner toroid. |
|
|
Robert
Leckey and Eric Huwald with the assembled analyzer. |
|
Analyzer
assembled. |
|
|
Len
Broekman mounting mu-metal shield. |
|
mu-metal
shield mounted. |
|
|
Detector
assembly. |
|
Len
Broekman, Robert Leckey and Anton Tadich inserting detector assembly
into analyzer. |
|
|
Analyzer
as assembled. In the background, John Riley. |
|
First
test.Diana James, Anton Tadich, Robert Leckey and Len Broekman evacuating
the vacuum chambers. |
| |
|
|
|
Unpacking
at BESSYII: |
|
|
|
|
|
Len
Broekman and Anton Tadich starting to unpack. |
|
Eric
Huwald giving them a hand. |
|
|
Konstantin
Emtsev and Eric Huwald removing the last panel of the box. |
|
Robert
Leckey finding out that the detector has survived the trip. |
|
|
Two
tons are lifted... |
|
...
guided to the beamline ... L to R: L. Broekman, Helmut Pfau,
Th. Seyller, J. Riley, Olaf Schwarzkopf, Kai Godehusen. |
|
|
...
and finally lowered onto the ramp at TGM7, which is at an angle
to the horizontal. L to R: K. Emtsev, A. Tadich, R. Leckey,
H. Pfau, and Th. Seyller. |
|
John
Riley checking the vacuum and motor control software. |
|  |
System
wired up ready for first tests. |
|
View
from the gallery. |
|
First
appearance of the Shockley surface state on the monitor! |
|
The group members present during the first run at BESSY II:
Eric Huwald, Konstantin Emtsev, Anton Tadich, Thomas Seyller,
Len Broekman, Robert Leckey, John Riley (L to R).
|